Home

The Peanut Belt RPO is a Rural Transportation Planning Organization comprised of Bertie, Halifax, Hertford, and Northampton Counties. Through cooperation between the North Carolina Department of Transportation (NCDOT), Local Government Staff, and Elected Officials, the RPO works to evaluate and meet the transportation needs in the area.These needs will include highways, bikeways, pedestrian walkways, and rail systems.


PBRPO Prioritization 4.0 Local Input Points Assignment - Division Tier

In accordance with the Peanut Belt RPO P 4.0 Local Input Point Assignment Methodology, posted below is the Local Input Points Assignment for the Division Tier. 

PBRPO P 4.0 Local Input Points Assignment - Endorsed October 25 2016.pdf

For questions or to provide comments, please contact Caleb Eller, RPO Transporation Coordinator, at This e-mail address is being protected from spambots. You need JavaScript enabled to view it or by phone at 252-519-2613.

 


 

PBRPO Prioritization 4.0 Local Input Point Assignment Methodology

In accordance with legislative requirements, each MPO and RPO throughout the state is required to develop a Local Input Point Assignment Methodology. This Methodology will be used to prioritize projects within the PBRPO, which will then be submitted to NCDOT for programming the Statewide Transportation Improvement Program(STIP). The following Local Input Point Assignment Methodology was approved by the Strategic Prioritization Office of Transportation at NCDOT and by the PBRPO TCC and TAC on May 19th 2016.

PBRPO SPOT 4.0 Local Input Point Assignment Methodology